100-105 Training | The network manager has requested

Question : 14

The network manager has requested a 300-workstation expansion of the network. The workstations are to be installed in a single broadcast domain, but each workstation must have its own collision domain. The expansion is to be as cost-effective as possible while still meeting the requirements. Which three items will adequately fulfill the request? (Choose three).

A. one IP subnet with a mask of 255.255.254.0
B. two IP subnets with a mask of 255.255.255.0
C. seven 48-port hubs
D. seven 48-port switches
E. one router interface
F. seven router interfaces

Answer: A,D,E