300-370 | An alarm is reporting that one of four ports…

Question: 4

An alarm is reporting that one of four ports of a lag group have gone down on a wireless LAN controller. Which troubleshooting methodology can be used to begin the troubleshooting process?

A. shoot from the hip
B. bottom-up
C. top-down
D. follow the path
E. divide and conquer

Answer: B

300-070 | Which two options can a route pattern…

Question: 7

Which two options can a route pattern be assigned? (Choose two.)

A. a gateway that is not assigned to a route group
B. a gateway that is assigned to a route group
C. a route list with no route groups configured
D. a route list with one or more route groups configured

Answer: A,D

300-370 | A company consists of two adjacent….

Question: 1

A company consists of two adjacent buildings, each with its own Cisco 5508 Wireless Controller with APs joined to the controller in the building. The two controllers are configured identically except for interface IP addresses. Only one SSID is being used in both buildings. The clients in building A are not experiencing any connectivity issues, but (he clients in building B report poor connections an engineer performs a site survey and finds co-channel interference, yet discovers mac Transmit Power Control was never performed on the APs and that Radio Resource Management is not functioning like it does in building A Furthermore, the controllers are in the same RF group and controller A is elected RF leader. Which action will improve client connections in building B?

A. Ensure WMM is enabled on the SSID.
B. Manually select controller B as RF group leader.
C. Configure controller B to be in a separate RF group.
D. Doable the low data rates on the a radio and the b/g radio in building B.

Answer: C

Free 300-370 Sample Question exam questions answers. These Q&A online braindumps are free to use for your 300-370 Sample Question practice test. We keep adding more questions so keep coming to get dumps.

Leave a Comment.